The burden of expectations (4)

CIMG2562As quickly as we could we collected the necessary documents for JA. Since they asked for three years’ worth of tax information we not only had to go back to the Narita tax bureau, we had to go into Tokyo to ask for proof of local taxes that we paid to Arakawa Ward for the first half of 2011, since that’s where we were living. Also proof of health insurance payments. We wondered what we would have had to do if we’d moved much farther away. As it was, going into Tokyo was enough of a pain in the ass since the different offices always seem to be crowded.

We submitted all the documents to the loan officer, who said it would take a few weeks for them to look through them but he had already assured us we were good. At this point a curious thought occurred to us. We had told A-1 that we were going to borrow money from JA. We expected N to act put out since he had gone to the trouble of introducing us to SBI, but in the end he didn’t really care. As long as we had the money he couldn’t complain. But, in actuality, we didn’t have the money, and wouldn’t for a long time. A lending institution won’t transfer the funds attached to a loan for a new home, meaning one that is being occupied for the first time, until the home is ready to be occupied, and in our case that wouldn’t be until Christmas at the earliest. In fact, we hadn’t signed the contract with A-1 yet, though it had been drawn up. The sticking point for us was the payment schedule. First we had to pay the design fee up front, which was about half a million yen. Then when we sign the contract, we pay a portion of the construction cost, almost a third. And then, when the roof beams have been completed, about two months into contruction, we pay another third. The last payment is made when the house is completed. So that means before the money for the loan is transferred into our account, we have to pay two-thirds of the cost of the house on top of the money we had to shell out for the land. If we had bought a house already completed, then it would be no problem, but we’re having it built. In our case it isn’t that bad because we had initially planned to pay cash for everything, land and house, until we realized that we would have to increase our budget if we wanted to own a place that fit our minimum conditions and needs. So we do have enough cash to make all the payments. It’s just that we will be broke until the loan comes through. But what about people who don’t have that much cash on hand, people who are borrowing almost all of the money needed to build their houses? What if they’re buying a condo based on a design, meaning the actual structure won’t be completed for another year or two? Again, if you’re working with a developer or a builder, they will make everything as smooth as possible, since they will likely be working hand-in-hand with a lending institution. For people like us who are doing everything themselves, there are special intermediary loans called tsunagi-yushi that you can take out to make the initial and mid-term payments, but they require another screening process and often have higher interest rates. Since they’re usually paid back when the housing loan comes through the payments don’t last long, but during that period if the borrower is, say, paying rent, it could be a real burden, depending on how long it takes to put up the house or condo. So that’s another expense you might have to deal with if you’re building a house. Read More